11th POST on Queen, NOTL
High end restaurant, supplied and installed structural steel, joist's and metal roof deck
Over 1,000 structural steel projects completed since 1988 — here are a few highlights, from airport control towers to custom residential steel.

High end restaurant, supplied and installed structural steel, joist's and metal roof deck

Custom detailing and fabrication with erection and transport.

Fabrication and installation of air traffic control towers for Toronto, Oshawa, and Waterloo.

Detailing for this project was created in house. Being located on John St. in Hamilton, the drawings for this project had to accommodate the strict parameters of the historical building design. The stainless steel used for this project was fabricated in-house, where it was then transported to the site location for careful installation.

Supplied detail, fabrication, and erection of miscellaneous metals (i.e. railings, stairs, etc.)

80 tons of steel fabrication inhouse with transport and installation to the site.

Fabrication of 16, 85 ton caisson frames supplied for international bridge

Supplied crane services, rigging and labor to rework an existing sign

Supplied and installed structural steel for the commercial building

This internet tower erection took place in the Town of Smithville during the winter of 2017. Detailing and materials fabrication were completed in-house before being transported to the project site for installation.

Fabrication and erection of structural steel frames

Removed large sign frame from the hotel

Currently ongoing; supplied framing and rework of existing building for new boiler installation as part of a new children's hospital

Detailing for this project as well as the steel fabrication for this project were both completed in-house. The equipment was transported with the crew to the project site in Oshawa where it was erected. The project itself took place over the course of January 2017 to April 2017.

Detailing, fabrication and installation was facilitated inhouse with our crew successfully completing the 230 ton erection.

Supplied structural steel for a four story condominium building

This airport control tower project was detailed and fabricated in-house. This included the transport of our crew and equipment across Canada (as this project is located in British Columbia) where the tower was erected. In total, this project took about 7 weeks to complete during the summer of 2017.

Supplied and installed structural steel framing for the Coastguard building

Fabrication and erection of structural steel frames

Supplied and installed structural steel for custom lakefront house
Let's talk about scope, timeline, and budget for your next structural steel job.